Construction Building Material Mideast Steel Prop Galvanized Painted Acro Jack Formwork Shoring Heavy Duty Steel Prop Scaffolding Steel Prop for Formwork
Basic Info
Model NO. | scaffolding prop |
Erection Position | Internal Scaffolding |
Scaffolding Part Type | Scaffolding Props |
Construction Properties | Building Scaffold |
Outer Tube | 60/56/48mm |
Inner Tube | 48/40mm |
Tube Thickness | 1.6-4.0mm |
Adjustable Length | 2400-3900mm, 2000-3500mm, 3000-5500mm or as Per Yo |
Surface Treatment | Hot Dipped Galvanized, Pre Galvanized, Painted, Po |
Keyword | Steel Prop |
Model | Light-Duty, Heavy-Duty |
Application | Hotel, Apartment, Office Building, Formworks |
After-Sale Service | Online Technical Support, Onsite Installation, Fre |
Color | Customer′s Request |
Usage | Formwork |
Delivery Time | 25-30 Days |
MOQ | 1 Container |
Transport Package | Packing in Bundle |
Specification | 48.3mm |
Trademark | TFCO |
Origin | Tianjin, China |
HS Code | 73084000 |
Production Capacity | 50 Twenty-Foot Container Per Month |
Product Description
SPECIFICATIONS FOR ADJUSTABLE STEEL PROP | |||
Description | Adjustable Steel Props for Scaffolding formwork | ||
Tube size | 48/60mm, 40/48mm, 48/56mm | ||
Tube Thickness | 1.6-4.0mm | ||
Adjustable Length | 2400-3900mm, 2000-3500mm, 3000-5500mm or as per your drawing | ||
Surface treatment | Hot dipped Galvanized, Pre galvanized, Painted, Powder coater | ||
Type | Heavy Duty, Light Duty | ||
MOQ | One container | ||
Delivery time | within 20 days | ||
Application | scaffolding and formwork |
Detailed Images
Base Plate
The popular types for base plate and top plate are flower plate and square plate. Common sizes are 120*120mm, 150*150mm, 140*140mm with thickness 3-8mm.
Screw Part
There are two kinds of threading part. One has welding joint and the other one without welding joint, which is screwing directly on the outerside tube.Nut Coupler
Wing nut coupler is frequently used in heavy duty steel props, while the cup nut is common in light duty steel props. Usually the cup nut steel props has the tube size 48/56mm.Smooth welding lines
We have 5 auto welding lines in production, all props are welded with solid and smooth welding lines. During the in-line production process, our QC will detectthe lack of welding.
Packaging & Shipping
Our Advantages
1) We have our own steel pipe production lines, which provide raw material for steel props. Thus can control the quality and delivery time better.
2) Professional welding engineers with more than 10 years welding experience for high quality welding
3) QC team to do the inspection for sizes, thickness, welding part and surface during in-line production and final packing
4) 15 years experience in Steel Pipe and Scaffolding field, and rcih cooperation experience with heavy buyers
5) Fast delivery
Company Profile
Our Team
FAQ
1.Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly. 2.
Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet. 3.
Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.4.
Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100 workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.5.
Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.6.
Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.7.
Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.