Adjustable Mechanical Prop Scaffolding/Steel Support for Construction
Basic Info
Model NO. | JY-141 |
Supporting Mode | Projecting Scaffolding |
Lapping Form | Single Row Scaffolding |
Erection Position | External Scaffolding |
Move Method | Attached Lifting Scaffolding |
Scaffolding Part Type | Scaffolding Props |
Construction Properties | Building Scaffold |
Working Life | 3-4 Years Normal Condition |
Color | Yellow/Red/Green/Blue/etc. |
Delivery Time | About 20-30 Days After Confirmation |
Surface Treatment | High Protected Painted, Powder Coating |
Usage | Construction Formwork |
MOQ | 500PCS |
Transport Package | in Bundles with Steep Strip |
Specification | Customized |
Trademark | JianYi/OEM |
Origin | Foshan |
HS Code | 7308400000 |
Production Capacity | 100 Tons/Day |
Product Description
Our Advantages
a.Your inquiry related to our product & price will be replied within 24hours.
b.Well-trained & experienced staffs are to answer all your inquiries professional in English of course.
c..All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
d.Excellent quality and Competitive price,OEM is highly welcomed.We have strong R&D team here to help.
e.Less than one container loading is accepted
f.On time delivery, in general 25-40 days.
g.Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.
Function of Steel Prop Scaffolding
Steel Prop Scaffolding is a individual pipe support for interior concrete floor. For decades, Steel Prop Scaffolding is still the first choice by building contractors for the following reasons:
1.Fully adjustable, no working height limit.
2.Easy to erect and dismantle,labour and time saving.
3.High supporting capacity.
4.No ledger, flexible to erect anywhere
5.Economical to use.
Details of Adjustable Steel Prop Scaffolding:
Middle East Type Prop (48/60)
Code | Material | Adjustable Height(mm) | Outer Tube OD(mm) | Thickness(mm) | Surface Treatment |
PM1629 | Steel | 1600-2900 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
PM1832 | Steel | 1800-3200 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
PM2035 | Steel | 2000-3500 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
PM2240 | Steel | 2200-4000 | 60 | 1.8/2.0/2.2/2.5/3.0 | Hot Dip Galvanized(HDG); electrogalvanized; powder coated; dip painted |
Product Description
Adjustable Mechanical Prop Jack Scaffolding/Steel Support For Construction
main products
Detailed Photos
recommend products
https://fsjianyi.en.made-in-china.com/product-group/beNAoFaHMPkd/prop-catalog-1.html
Certifications
FAQ
Q: Are you a real factory or a trading company?
A: We are of course a factory with three production lines and various machines ,Our factory is located in Guangdong, Province,Foshan.
Q: What is your main product?
A: Our factory main products include adjustable steel prop, frame scaffolding, ringlock scaffolding, quicklock scaffolding, cuplock scaffolding, kwikstage scaffolding, steel pipes & couplers, steel formworks,plywood, formwork clamps, adjustable U head jack & jack base, and other scaffolding&formwork accessories. wheel buckle scaffolding with the specifications of DMJ.
Q:How can we visit your factory?
A:By high speed rail to foshan city,or by air to Guangzhou baiyun airport. You can inform us the arriving time and we will arrange driver to pick u up.
Q: What kind of certificate do u provide?
A: ISO9001,CE,SGS and If you want to have a product quality test also support.
Q: What about delivery time?
A: Often by sea need 7-15 days after confirm.
Q:What about sample fee?
A:We can supply the sample if we have ready parts in stock, but the customers should pay for the sample cost and freight.
Contact us:
If you have any questions, pls feel free to contact us,
Any your requirements will be highly appreciated!
Contact: Brian Zhang